News

On the Greenway: Progress on Section 14A

Check out these recent photos of the construction of Section 14A of the Wolf River Greenway.  This section connects the Wolf River Greenway to Shelby Farms Greenline and includes a bridge over the Wolf River.

   

   

Posted by Cathy Justis at 7:50 PM